We pride ourselves on our thorough pre-construction process - ensuring the journey to construction is as seamless as possible.
Just Starting?
FIRST STEPS
DISCOVERY
MEETING
Meeting Agenda
OVERVIEW
A general review of the building site and potential
considerations specific to your block and ideas.
CONSULTANTS
Basic estimate of pre construction fees from external
consultants - Designer, Engineer, Town Planner ect.
FEASIBILITY
Feasibility of client desired outcome based on block,
budget and size and style of house.
RATES
Basic m2 rate of build based on verbal client
information about ideal build.
RECS
Recommendation of architect/designers based on
client brief and budget.
EDUCATION
Education on typical timeline to get from here to a
build contract.
WALKTHROUGH
Book time for client to see and walk through a
current Tide build to show level of finish.
MOVING FORWARD
PHASE ONE
Information Gathering & Preliminary Costing - $2450 inc. GST
01.
First discovery design meeting with Client and
Designer to obtain brief and inspiration for facade and
layout.
02.
Detailed proposal of build costs after concept plans
are complete. Allowances/estimates to be used for
selections and information not yet obtained (based off
clients brief/budget).
03.
Meeting with Client to review proposal and Tide
value management worksheet. (VM worksheet is a
detailed review of efficiencies and build costs to
optimise plans).
04.
Refine proposal and plans based off first proposal cost
vs budget.
DRAFTING AND FINALISING
PHASE TWO
Engage Tide on Preliminary Agreement /
Deposit of 0.75%
05.
Engage consultants, arrange Engineer, Town
Planner, Interior Designer. (Interior designer / town
planner not always required).
06.
Review consultants plans and value manage for
efficiencies. Work with client to optimise.
07.
Tide begins tender process and builds out scope of
works for each trade and complete detailed take offs
for all materials to provide a fixed quote.
08.
Review proposal with Client and make adjustments if
required to value manage or meet budget. Repeat
above steps if budget is not met. Review all remaining
documentation to assist client to Certification.
09.
Draft fixed price build contract and full gant chart
build schedule.
tide constructions timeline
Timeline of Events Prior to Plans
Already Have Plans?
FIRST STEPS
DISCOVERY
MEETING
Meeting Agenda
OVERVIEW
A general review of the building site and plans
CONSULTANTS
A general review of external consultants already
engaged by client.
FEASIBILITY
Feasibility of client desired outcome based on block,
budget and plans.
RATES
Basic m2 rate of build based on verbal client
information about ideal build.
RECS
Review of architect/designer based on client choice.
EDUCATION
Education on typical timeline to get from here to a
build contract.
WALKTHROUGH
Book time for client to see and walk through a
current Tide build to show level of finish.
MOVING FORWARD
PHASE ONE
Information Gathering & Preliminary Costing - $2450 inc. GST
01.
Detailed proposal of build costs after concept plans
are complete. Allowances/estimates to be used for
selections and information not yet obtained (based off
clients brief/budget).
02.
Meeting with Client to review proposal and Tide
value management worksheet. (VM worksheet is a
detailed review of efficiencies and build costs to
optimise plans).
03.
Refine proposal and plans based off first proposal cost
vs budget.
DRAFTING AND FINALISING
PHASE TWO
Engage Tide on Preliminary Agreement /
Deposit of 0.75%
04.
Engage consultants, arrange Engineer, Town
Planner, Interior Designer. (Interior designer / town
planner not always required).
05.
Review consultants plans and value manage for
efficiencies. Work with client to optimise.
06.
Tide begins tender process and builds out scope of
works for each trade and complete detailed take offs
for all materials to provide a fixed quote.
07.
Review proposal with Client and make adjustments if
required to value manage or meet budget. Repeat
above steps if budget is not met. Review all remaining
documentation to assist client to Certification.
08.
Draft fixed price build contract and full gant chart
build schedule.
tide constructions timeline
Timeline of Events With Client Provided Plans
HOW WE STAND OUT
Client Prestart
Before commencing work onsite, your dedicated Project Manager & site
team will all meet onsite to discuss the project & Tide expectations.
Client Portal
You will receive a Onedrive Link with all of the information for your
project. This includes plan sets, meeting minutes, site photos & quality
checks throughout the build.
Tide Scheduling
A full Gantt chart schedule will be provided before the build starts and
will be available at all times in the Client Portal. If changes are made to
the schedule you will be notified immediately by your Project Manager.
Procurement
The Tide Contracts Management Team will send out all purchase
orders in relation to materials and labour for your project. This ensures
all lead times for materials are factored into the schedule and there are
no unexpected cost increases.
Weekly Meetings
Each week your Project Manager will book a site meeting to walk you
through the progress. In addition to this, plumbing, electrical & joinery
walk-throughs will also be booked with you to ensure you are involved
in every aspect of the build, right down to powerpoint refining and tap
heights.
Audits
We use an advanced quality assurance application that is extremely
thorough. Typically a Tide build will have on average 30 quality assurance
inspections. This includes - checking deliveries & ensuring ordered items
are correct & delivered in perfect condition, checking the work of
subcontractors, and ensuring every aspect of your build is accurate and
built to a higher standard.
Site Security
At the start of the build, a Site Camera & lockable construction fencing
will be set up onsite. This ensures the site is kept safe & secure when no
one is there. We have 24/7 access to the cameras so you can be sure your
home is always safe.
Quality Assurance
“Built to a higher standard” is the cornerstone of everything we do. Our
processes & procedures ensure we deliver an exceptional product, always!
No exceptions!
Handover & Defects
One month before handover we begin our bi-weekly inspections with the
Director himself. This means anything and everything that can be
scrutinised will be to ensure on the most important day of your journey
you will be able to “cheers” a champagne or beer with us, knowing we
reached perfection!
If you want to begin building your dream home, there is no time like the present. Tide has limited availability each season for new home builds to ensure each and every project receives our full attention.